KSTSBiogas & Bioenergy BM中文 Desktop
Chinese-language press report on the IEM Sabah Branch CPD talk on palm oil mill biomass, Asia Times Sabah edition, 23 August 2026
In the news — Asia Times (Sabah edition), 23 August 2026: palm oil mill waste turned into green energy.

POME biogas · palm biomass · biomethane · Sabah & Sarawak

Palm oil mill waste, turned into firm 24/7 power.

KSTS designs, builds and supports biogas power plants and biomethane upgrading systems for palm oil mills across Sabah and Sarawak — with technology from SINOPEC Dalian Research Institute of Petroleum and Petrochemicals, and engineers from a Tsinghua University PhD team.

Size your plant in 30 secondsSend your mill data
270–300Nm³/h biogas for a 600 kW set at 60% CH₄
38–42%Electrical efficiency, gas engine
≥97%CH₄ biomethane for boilers and bio-CNG
8,000 hDesign operating hours per year

What we deliver

One contract, from pond cover to grid-tie

Most mills already have the raw material and the pond. What is missing is gas quality control, the engine package and one party accountable for the whole chain.

01 · Process

Biogas capture & treatment

Covered lagoon or CSTR, condensate management, biological plus iron-oxide desulfurisation, chilling, drying, blower and flare — sized to the engine specification.

02 · Equipment

Gas engines 300 kW – 2 MW

Containerised or skid-mounted biogas gensets, 415 V / 50 Hz, island or parallel operation, with jacket-water and exhaust heat recovery. Brushless doubly-fed generator available as an option for gas that swings.

Brushless doubly-fed option →

03 · Delivery

EPC, BOO or equipment only

Straight equipment supply, full EPC with local civil and mechanical works, or build-own-operate where we fund the plant and sell power or gas to the mill.

Two ways to monetise the gas

Electricity now, biomethane when the boiler matters more

Route A · Power & heat

Displace diesel and grid import

Inland Sabah mills often run diesel gensets at RM 0.55–0.75/kWh. POME biogas at 60% CH₄ can carry a large share of that load, with useful heat as a by-product.

Biogas to power →

Route B · Biomethane

Boiler fuel and bio-CNG

Where the mill needs boiler fuel more than electricity, biogas can be upgraded to ≥97% CH₄ for the existing burner, or compressed as bio-CNG and moved by trailer.

Biomethane & bio-CNG →
What a mill actually gives us

Typical design basis

These are the ranges we use for pre-feasibility. Every project is re-based on one to two weeks of measured gas flow and composition.

← 左右滑动查看完整表格 / swipe to see all columns
Parameter Typical range Why it matters
POME generation0.6 – 0.7 m³ / t FFBSets the pond and digester volume
POME COD50 – 80 g/LMethane potential per m³
Biogas yield (covered lagoon)20 – 28 Nm³ / m³ POMEThe most uncertain number — we verify it
Methane content55 – 65% CH₄Drives gas flow per kWh
Hydrogen sulphide1,000 – 4,000 ppm H₂SDecides desulfurisation duty
Operating hours7,000 – 8,000 h/yearRevenue and maintenance reserve

KSTS project experience and published Malaysian POME data. Pre-feasibility only — not a performance guarantee.

Check the numbers before you talk to a supplier

Engineering tools

Seven calculators built on the formulas we use in proposals. No sign-up, no email capture.

Tool 01

Gas to power & heat

Biogas flow in, electrical and thermal output out.

Open →

Tool 02

Capacity sizing

Target kW in, required gas flow out.

Open →

Tool 03

Mill to biogas

FFB throughput to methane potential.

Open →

Tool 04

Upgrading yield

Raw biogas to ≥97% biomethane.

Open →
Sabah-based, with the statutory credentials that matter

Local presence

A biogas plant needs a DOSH-registered engineer for steam and I.C.E. inspection under FMA 1967, an ECOS-registered energy manager, and a CIDB contractor. KSTS holds all three.

Managing Director

Sdr. Leong Kian Sheng (Alvin)

B.Eng.Tech(Mech Eng)(USQ)• Eng Tech (BEM)• ASEAN Eng Tech (AER)• IncIEM• MMOSTA• Grad Tech (MBOT)• TMIEAust

  • DOSH Registered 2nd Grade Steam Engineer
  • DOSH Registered 2nd Grade I.C.E. Engineer
  • DOSH Certified OSH Coordinator
  • ECOS Registered Electrical Energy Manager
  • BEM Registered Engineering Technologist (Manufacturing)
  • AER Registered ASEAN Engineering Technologist
  • IEM (IncIEM) No. 35532 · ASEAN Eng Tech (AER) · MMOSTA · Grad Tech (MBOT) · TMIEAust
  • CIDB Green Card Holder · IRWS Professional Engineer
  • CIDB Registered Contractor · Bumiputera Sabah
Full profile

What that means for a project

Permitting and statutory inspection are usually the schedule risk, not the engine. Having DOSH and ECOS registrations in-house means the plant is designed to the inspection regime from day one.

← 左右滑动查看完整表格 / swipe to see all columns
Civil & mechanicalCIDB-registered execution, local labour and plant
StatutoryFMA 1967 steam and I.C.E. inspection
Energy caseECOS-registered energy manager reporting
O&MLocal crew, remote support from the factory
Invited to speak at the Institution of Engineers Malaysia, Sabah Branch
Report on the IEM Sabah Branch CPD talk on palm oil mill biomass presented by Alvin LeongChinese-language report on the IEM Sabah Branch CPD talk, Asia Times Sabah edition, 23 August 2026
Report on the IEM Sabah Branch CPD talk, Kota Kinabalu.

In the news

Alvin Leong presented “Transforming Palm Oil Mill Biomass Wastes” at the IEM Sabah Branch CPD talk in Kota Kinabalu — cogeneration and Bio-CNG from palm kernel shells, palm fibre and POME.

Sabah has 129 active palm oil mills producing an estimated 25.75 million tonnes of biomass a year.

Read more
Have a mill, a pond and a diesel bill?

Send throughput, pond volume and one week of gas data if you have it. We come back with a capacity, a gas specification and a budget.

Request a pre-feasibility
Biomethane & bio-CNGHydrogen CHPBHP air-conditioningBiogas power plantEquipment & scope

Related sites

Fluid machinery energy-saving calculatorHONGSHI — industrial pumps (export)

KSTS K. S. Technical Services · Sabah, Malaysia

k.s.t.s_sabah@hotmail.com · +60 13-883 3833

© 2026 · Mobile edition

⌂Home ✉Get a study