Hydrogen CHP · 7.5–100 kW

Bottled biomethane in, power and hot water out.

Methane reforming plus a fuel cell: the same architecture as Japan's household fuel-cell CHP, scaled to estate housing, resorts, mills and off-grid communities. Two feeds work: bottled 97% biomethane, or raw 60% biogas taken straight from the mill with an integrated purification front end. Either way the methane is reformed on site into hydrogen and converted to electricity and 60–70 °C hot water — no pipeline, no diesel, no flame at the point of use.

RM 10,000 / 19,500FOB price per kW: bottled 97% gas / raw biogas with integrated purification · /kW
42%Electrical efficiency, guaranteed (LHV)
43%Recoverable heat, guaranteed (LHV)
0.24 Nm³Fuel per kWh sent out

Six zeros

Nothing leaves this unit but water.

No burner, no engine, no flue in the usual sense. This is the strongest reason to choose reforming plus a fuel cell over a diesel or gas engine — and it is measurable at the fence line, not a marketing line.

01 · No noise

No engine, no burner

The only moving parts are a blower and pumps. About 55 dB(A) at one metre — quieter than a normal conversation, so the unit can stand beside staff housing.

02 · No nitrogen oxides

NOx = 0

A fuel cell runs at 60–200 °C. With no high-temperature flame, thermal NOx cannot form at all — it is below detection, not merely “low”.

03 · No sulphur oxides

SOx = 0

Gas is desulphurised to below 1 ppm before the reformer. No sulphur enters the process, so none can leave it — no SO₂, no acid smell, no corrosion downstream.

04 · No dust or particulates

PM = 0

Gas fuel, sealed process, no combustion air and no flue: no particulates, no black smoke, no smell — unlike diesel exhaust, which is a known health hazard.

05 · Pure water only

H₂O

The electrochemical reaction produces water and heat. The water is clean enough to recover for washing or irrigation instead of discharging it.

06 · Near-zero CO₂

CO₂ ≈ 0

The carbon is short-cycle carbon from palm waste, and reforming gives a concentrated CO₂ stream that is far easier to capture than dilute flue gas. This is a path to zero, not just “lower”.

You can hear the difference at the fence line.

A diesel genset is the exact opposite on all six counts: 95–105 dB(A), NOx, SOx, black smoke and a fuel tank. Ask for the emissions sheet with the quotation.

Why this fits Malaysia

The fuel chain already exists — the generator was missing

Biogas is already being upgraded to 97% methane and sold in cylinders to households and shops. That means the hard part — gas cleaning, compression and distribution — is solved. What is missing is a quiet, low-maintenance generator that can burn that gas where it is used.

01 · Fuel

Bottled biomethane, no pipeline

A 50-litre cylinder at 200 bar holds about 10 Nm³ of methane — roughly 99 kWh of fuel, or 10 hours at 10 kW electrical. Cylinders can be swapped like LPG, so there is no gas network to build and no stranded asset if demand moves.

02 · Cost

Against diesel, not against the grid

Off-grid estates, islands and remote resorts in Sabah pay RM 0.90–1.30 per kWh for diesel power once fuel logistics, servicing and downtime are counted. That is the number this unit competes with — not the subsidised grid tariff.

03 · Heat

Hot water is half the output

A fuel cell makes electricity and heat at the same time: 42% electric, 43% recoverable as 60–70 °C water. Staff housing, kitchens, laundries, sterilisation and hotel hot water all use that heat directly, which is what lifts total efficiency to about 85%.

Bottled gas, or raw biogas straight from the mill

Two feed options

The reformer and fuel cell are the same in both cases. Only the front end changes — and it is built into the same package, not bought as a separate upgrading plant.

A · Bottled 97% biomethane

Lowest investment, fuel bought by the cylinder

Standard specification. The gas arrives at 200 bar already at 97% methane, so the unit only needs desulphurisation and filtration before the reformer. Nothing to build, nothing to operate upstream — but you pay the bottled-gas price for every Nm³, and you depend on the cylinder supply chain.

RM 10,000/kW · FOB, installation excluded

B · Raw biogas, about 60% CH₄

Straight from the palm oil mill — purification built in

Take the biogas directly off the mill pond and skip upgrading, bottling and trucking altogether. An integrated front-end purification module — desulphurisation, CO₂ removal, drying and compression — is supplied as part of our unit and lifts the gas to the ≥95% methane the reformer needs. Higher investment than option A, but the fuel is the mill’s own biogas instead of bought cylinders, and there is no separate upgrading plant to pay for.

RM 19,500/kW · FOB, integrated purification included in the unit

Both options use the same reformer and fuel cell; option B simply adds the purification front end inside the same enclosure or skid. The added cost depends on gas flow, H₂S and CO₂ content, so it is quoted per site after a gas analysis — send us your measured flow, methane content and H₂S and we will price both versions side by side.

From methane to electrons in five steps

Process

ConditionDesulphurisation to below 1 ppm H₂S, plus filtration. The reformer catalyst is poisoned by sulphur. On raw 60% biogas the same integrated module also strips CO₂ and water.

ReformSteam reforming at 650–800 °C: CH₄ + H₂O → CO + 3H₂, followed by water-gas shift.

PurifyPSA or membrane to 99.9% H₂; the off-gas is burned to heat the reformer, which is why efficiency holds.

ConvertPEM fuel cell at 65–75 °C, or PAFC at 160–200 °C for higher-grade heat.

Deliver230/400 V AC plus 60–70 °C hot water. Grid-tie or island mode, black-start capable.

No hydrogen is stored. Hydrogen is made on demand and consumed inside the unit — that is what keeps the safety case simple and avoids a pressure vessel on site.

Eight models, 7.5 to 100 kW

Range

Fuel figures are at rated output, 97% methane, LHV basis. Hot water is at a 50 K rise (20 → 70 °C). Prices are FOB to Malaysia at RM 10,000 per kW, installation excluded.

← 左右滑动查看完整表格 / swipe to see all columns
Model Fuel input (kW) CH₄ (Nm³/h) Heat (kW) Hot water 50 K (L/h) Indicative price, bottled gas Price, raw biogas with purification
7.5 kW17.91.807.7132RM 75,000RM 146,250
10 kW23.82.3910.2176RM 100,000RM 195,000
15 kW35.73.5915.4265RM 150,000RM 292,500
20 kW47.64.7920.5353RM 200,000RM 390,000
30 kW71.47.1830.7529RM 300,000RM 585,000
50 kW119.011.9751.2882RM 500,000RM 975,000
75 kW178.617.9776.81,323RM 750,000RM 1,462,500
100 kW238.123.95102.41,763RM 1,000,000RM 1,950,000

Minimum order: 10 units per export shipment. Below that we still quote — with a one-off RM 60,000 export engineering and logistics charge and a small-order unit-price uplift; a single 7.5 kW unit shipped on its own spends as much on export overhead as it carries in margin. Units of 30 kW and above, or orders worth RM 300,000 and above, are exempt from the 10-unit minimum. Basis: methane LHV 9.94 kWh/Nm³; manufacturer-guaranteed 42% electrical and 43% heat recovery at rated output (85% combined) — to be reconfirmed against the guarantee sheet for each model. On raw biogas at 60% CH₄ the raw gas flow is about 1.67× the CH₄ figure, and the integrated purification module is sized to that flow. Prices are FOB Malaysia port, installation excluded: bottled 97% gas at RM 10,000/kW, raw 60% biogas with the integrated purification front end at RM 19,500/kW. Freight, insurance, SST, local installation, civils, cylinder storage, gas manifold and grid connection are excluded and quoted per site.

One cabinet: reformer, purification, fuel cell, heat recovery

The unit

Skid-mounted and factory-tested. Arrives as one enclosure, connects to gas, water and the distribution board — no separate reformer building, no flue, no engine room.

Skid-mounted reforming fuel cell CHP cabinet
Skid-mounted cabinetReformer, purification, fuel cell and heat recovery in one enclosure.
Inside the CHP cabinet
Inside the cabinetStack, gas manifold and control cabinet on the service side.
Internal arrangement of the reforming fuel cell unit
Internal arrangementAll serviceable from the front; no specialist lifting gear needed on site.
Home and shop scale, 5 to 10 kW

Small units

Compact all-in-one units for a house, a shop lot or a resort block: about 1.8 × 0.6 × 1.4 m for 10 kW, parallelable in blocks for larger loads.

10 kW distributed reforming fuel cell unit
10 kW distributed unitAbout 1800 × 600 × 1400 mm. 1 m³ of gas gives 5 kWh, plus 60–90 °C hot water.
5 to 10 kW compact all-in-one CHP unit
5–10 kW compact unitFor a single house or shop; quiet enough to install beside the wall.
From methane to electrons, without a flame

How it works

Three drawings: the system composition, the fuel-cell reaction itself, and a household P&ID showing where the power and the heat actually go.

Fuel cell system composition
System compositionGas in, hydrogen at the stack, DC to an inverter, AC out — heat recovered from the stack.
Fuel cell principle: hydrogen and oxygen to electricity and pure water
Fuel-cell principleHydrogen and oxygen react electrochemically; the only product is pure water.
Household CHP P and ID with English labels
Household CHP P&IDBiogas is reformed to hydrogen on site; power goes to lighting, fridge, air conditioning, TV and a backup circuit, heat to domestic hot water, shower and space heating.

Photos and drawings: Huasen Hydrogen (Anhui) company brochure V1.4. High-resolution originals to be supplied for print use.

Three calculators — same formulas we quote from

Engineering tools

Sizing, model selection and project economics. Every assumption is editable; the formulas are the ones used in our pre-feasibility work.

A · Size and fuel demand

40–45% for reformer + PEM/PAFC at this scale; 50%+ only for large SOFC.

Fuel and output

Fuel energy input—
Methane at full load—
Methane per day—
Methane per year—
Cylinders per day (10 Nm³)—
Heat output—
Hot water at 50 K rise—
Annual generation—
Annual heat—
Combined efficiency—

B · Match the model to the load

Set 0 if you only want the model for a load.

Recommended unit

Model—
Indicative price—
Electrical output—
Methane needed—
Fuel coverage—
Heat output—
Annual generation—

C · Project economics

RM 10,000 for bottled 97% gas; RM 19,500 for raw 60% biogas with integrated purification.
Service contract plus stack provision. Stack replacement is the big item — 25–35% of unit price every 5–8 years.
Grid tariff 0.40–0.50; off-grid diesel 0.90–1.30. Use the cost you actually avoid.
Set 0 if there is no year-round hot-water demand.

Results (RM)

Total investment—
Net annual benefit—
Simple payback—
Electricity revenue—
Heat revenue—
Fuel cost—
O&M cost—
NPV—
IRR—
LCOE—
CO₂ avoided vs grid—

CO₂ uses 0.60 t/MWh avoided grid emission factor and treats biomethane carbon as short-cycle. At RM 10,000/kW FOB the unit is competitive where power costs RM 0.60/kWh or more, or where the heat replaces LPG or diesel. Against a subsidised grid tariff with bought gas it is still marginal — check the numbers rather than the brochure.

One strong case, one marginal

Worked cases

Case A · 10 kW, off-grid housing

Diesel replacement: about 1.5 years

12 staff houses, 10 kW average, diesel at RM 1.20/kWh avoided. Investment RM 100,000 FOB plus installation; 68,000 kWh a year at 85% load; fuel 16,300 Nm³ at RM 1.20; O&M RM 3,000. Net about RM 66,000 a year → payback 1.5 years, before any grant.

Case B · 50 kW, grid-connected

Grid tariff: about seven years

Same 50 kW unit against a RM 0.45/kWh grid tariff: RM 500,000 FOB, about RM 75,000 a year net — 6.7 years, inside a 10-year life but only just clearing an 8% hurdle, and only if the 43% heat is genuinely used. Remove the heat revenue and it stops working.

What the price covers

Scope & terms

← 左右滑动查看完整表格 / swipe to see all columns
IncludedReformer, shift reactor, H₂ purification, fuel-cell stack, inverter, heat exchanger, controls, enclosure
OptionalIntegrated front-end purification for raw biogas feed — desulphurisation, CO₂ removal, drying and compression inside the same package, priced per site
ExcludedSST, freight beyond Malaysian port, civils, cylinder store and manifold, installation, grid connection, permits
Warranty24 months on the unit, 5 years or 25,000 h on the stack, whichever comes first
Lead time4–6 months from PO and gas analysis
Fuel specificationCH₄ ≥ 95%, H₂S < 1 ppm, siloxanes < 0.1 mg/Nm³, no condensate
Price basisBottled-gas version: FOB RM 10,000/kW, installation excluded, valid 90 days, minimum 10 units per export order (units of 30 kW and above, or orders worth RM 300,000 and above, are exempt). Orders below 10 units are quoted at RM 12,500/kW plus a one-off RM 60,000 export engineering and logistics charge. Raw-biogas version with the integrated purification front end: quoted per site. Both subject to gas analysis and site survey.
← 左右滑动查看完整表格 / swipe to see all columns
OptionPowerHeatNoiseRM/kW
Diesel genset—nonehigh800–1,500
Gas engine CHP35%43%medium1,800–2,600*
H₂ fuel-cell CHP42%43%low10,000 / 19,500
NOx · SOx · dusthighlownonenone
Solar + battery—nonenone3,000–5,000

* Gas-engine CHP is the 500–1,000 kW class; it has no model below 100 kW. The fuel-cell unit is the only option in this range that gives quiet, flame-free power with usable heat at 7.5 kW upwards.

Questions we get asked

FAQ

Can it run on raw biogas?

Yes — with the integrated purification front end. Raw POME biogas at about 60% methane is desulphurised, stripped of CO₂, dried and compressed inside the same package, then fed to the reformer at ≥95% CH₄. The reformer itself still needs concentrated methane; what changes is that we do the upgrading in the unit instead of you buying bottled gas. Investment is higher than the bottled-gas version and is quoted per site on gas flow, H₂S and CO₂.

Is hydrogen stored on site?

No. Hydrogen is produced on demand and consumed inside the unit within seconds. There is no hydrogen vessel, no high-pressure storage and no delivery of hydrogen.

What maintenance does it need?

Annual service, reformer catalyst every 3–5 years, fuel-cell stack every 5–8 years (25–35% of unit price). Budget 3% of capex a year and you will not be surprised.

Can several units run together?

Yes. Units parallel on the AC side up to 1 MW, and a failed unit only takes its share of the load offline — which is why we prefer 2 × 50 kW to 1 × 100 kW where the budget allows.

All figures on this page are indicative engineering estimates for pre-feasibility. Formal quotation requires gas analysis, load profile and site survey.

Biomethane & bio-CNGHydrogen CHPBHP air-conditioningBiogas power plantEquipment & scope

Related sites

Fluid machinery energy-saving calculatorHONGSHI — industrial pumps (export)

KSTS K. S. Technical Services · Sabah, Malaysia

k.s.t.s_sabah@hotmail.com · +60 13-883 3833

© 2026 · Mobile edition

⌂Home ✉Get a study