These are the formulas we use in pre-feasibility work. They are deliberately transparent: every assumption is shown and you can change it. Use them to challenge a supplier’s numbers — including ours.
Selection at a glance
Enter the raw biogas flow and methane content from your own measurement. The selector returns the largest unit that runs on that gas at full load, plus the gas it needs and what it generates in a year.
| Model | CH₄ needed (Nm³/h) | Raw gas @45% | @55% | @60% | MWh/yr @90% load | Heat (kW) |
|---|---|---|---|---|---|---|
| 500 kW | 142 | 316 | 258 | 237 | 3,600 | 593 |
| 600 kW | 172 | 382 | 313 | 287 | 4,320 | 718 |
| 700 kW | 200 | 444 | 364 | 333 | 5,040 | 835 |
| 800 kW | 229 | 508 | 416 | 381 | 5,760 | 954 |
| 1,000 kW | 286 | 636 | 520 | 477 | 7,200 | 1,194 |
Based on manufacturer gas consumption (≈3.50 kWh per Nm³ CH₄), 8,000 operating hours and 90% load. Size on the 45% methane column when gas quality is uncertain — running out of gas costs more than buying one size larger.
Tool 01
Methane LHV 9.94 kWh/Nm³ (35.8 MJ/Nm³). Diesel genset at 35% efficiency and 2.68 kg CO₂/litre for the avoided-fuel figure.
Tool 02
Use this to test whether an offered engine matches your measured gas flow.
Tool 03
Assumes continuous 24-hour POME production. Real mills have shifts and stoppages — use measured inflow where available. Screening only, not a design basis.
Tool 04
Product = CH₄ in × recovery ÷ purity. Diesel equivalent at 35.8 MJ/L LHV.
Tool 05
Revenue assumes the stated value for each valued kWh. Excludes financing, land and utility grid upgrades. Screening model, not bankable.
Tool 06
Methane LHV 9.94 kWh/Nm³. Fuel input = output ÷ electrical efficiency; CH₄ flow = fuel input ÷ 9.94. Heat at 43% of fuel input, hot water at ΔT 50 K. CO₂ at 0.60 t/MWh of avoided grid power, biomethane carbon treated as short-cycle. FOB price, installation, civils, cylinder store and manifold excluded. Screening only.
Tool 07
Methane LHV 9.94 kWh/Nm³. Fuel input = cooling ÷ COP; heat = 25% of fuel input in cooling mode; hot water at ΔT 50 K. The comparison system buys kWh from the grid or a diesel genset and makes cooling at the stated electric COP. CO₂ at 0.60 t/MWh. Indicative only — confirm COP and heat recovery against the model guarantee sheet.
Method & constants. Methane LHV 35.8 MJ/Nm³ = 9.94 kWh/Nm³. Biogas energy = flow × CH₄ fraction × 9.94. Electrical output = fuel energy × electrical efficiency. Recoverable heat = fuel energy × heat fraction. All results are indicative; guarantees are issued only against measured site data. Why we publish the formulas. Most supplier calculators hide their assumptions. A biogas project is decided on gas quality and operating hours, not on a polished number.
KSTS K. S. Technical Services · Sabah, Malaysia