Biomethane & bio-CNG
If the mill boiler runs on diesel, LPG or natural gas, the fastest payback is often not electricity — it is replacing that fuel with biomethane at ≥97% CH₄, produced on site.
Process
DesulfuriseBiological plus iron oxide to protect media and compressor.
CompressTo the pressure required by the separation step.
DryRefrigerated dryer and coalescing filters.
Remove CO₂PSA, water scrubbing or membrane.
DeliverTo the burner, or 250 bar for tube-trailer bio-CNG.
Technology selection
There is no universal best choice. It depends on gas volume, required purity, power cost and available space.
| PSA | Water scrubbing | Membrane | |
|---|---|---|---|
| CH₄ purity | 96–98% | 97–99% | 96–98% |
| Methane recovery | 95–98% | 98–99% | 96–99% |
| Power demand | 0.25–0.30 kWh/Nm³ | 0.20–0.30 | 0.20–0.28 |
| Footprint | Medium | Large | Small |
| Best fit | 200–1,500 Nm³/h | Large plants | Small/medium, skid |
Output
| Raw biogas in | 500 Nm³/h @ 60% CH₄ |
| Methane in | 300 Nm³/h |
| Recovery (97%) | 291 Nm³/h |
| Product at 97% CH₄ | ≈ 300 Nm³/h |
| Product energy | ≈ 2,890 kW (LHV) |
| Upgrading power | ≈ 125–150 kW |
Burner retrofit is part of the scope. A biomethane burner needs a different gas train, orifice and flame detection from diesel or LPG — we coordinate that with the boiler supplier.
Bio-CNG
Compressed biomethane at 250 bar in tube trailers moves gas to estates, factories or refuelling points. For remote Sabah and Sarawak sites this is often the only route to market.
1
Multi-stage to 250 bar with inter-stage drying and cooling.
2
Cascade storage, loading arm, custody metering.
3
Pressure reduction skid or daughter station for fleets.
KSTS K. S. Technical Services · Sabah, Malaysia
k.s.t.s_sabah@hotmail.com · +60 13-883 3833
© 2026 · Mobile edition