Biogas to power

From the pond to the busbar

A POME biogas plant is a chain, not a machine. Gas quality at the engine inlet decides whether you get 8,000 hours or 4,000 hours between overhauls.

Process chain

Six stages, one gas specification

CaptureCovered lagoon or CSTR; cover, condensate traps, collection headers.
BufferGas holder to absorb mill load swings.
DesulfuriseBiological scrubber plus iron-oxide polishing.
ConditionChilling, coalescing, blower to engine pressure.
GenerateGas engine and alternator, island or parallel. Brushless doubly-fed generator optional — see the generator comparison.
Recover heatJacket water ~90 °C and exhaust to hot water or steam.

Selection

Engine size against available gas

At 60% CH₄ and 38–40% electrical efficiency, one cubic metre of biogas carries about 2.2 kWh of electricity.

Electrical outputGas at 60% CH₄Gas at 55% CH₄Recoverable heat
300 kW132 – 140 Nm³/h144 – 153 Nm³/h330 – 390 kW
500 kW220 – 234 Nm³/h240 – 255 Nm³/h550 – 650 kW
600 kW265 – 280 Nm³/h289 – 306 Nm³/h660 – 780 kW
800 kW353 – 373 Nm³/h385 – 407 Nm³/h880 – 1,040 kW
1,000 kW441 – 466 Nm³/h481 – 509 Nm³/h1,100 – 1,300 kW
1,500 kW662 – 699 Nm³/h722 – 763 Nm³/h1,650 – 1,950 kW
2,000 kW883 – 932 Nm³/h963 – 1,017 Nm³/h2,200 – 2,600 kW

Full-load figures. Running below 70% load for long periods causes carbon build-up and shortens the overhaul interval — size down or split into two units.

Gas specification

What the engine will accept

These limits are the basis of our warranty discussion with the engine supplier. If your gas cannot meet them, the treatment scope changes — we would rather say so before the order.

Methane content≥ 50% (design 55–65%)
H₂S at engine inlet≤ 200 ppm, target ≤ 100
Water dew point≤ 10 °C above ambient
Gas temperature≤ 40 °C
Inlet pressure5–15 kPa, ±1 kPa
Pressure fluctuation≤ 10% per minute

The most common mistake: accepting raw POME gas at 2,000–4,000 ppm H₂S. It halves lube-oil life and doubles maintenance cost, invisibly, until the first overhaul.

Economics

What O&M really costs

600 kW at 8,000 h/year, gas at 60% CH₄ after scrubbing:

ItemRM/kWh
Oil, filters, spark plugs0.014
Routine service labour0.012
Overhaul reserve0.016
Desulfurisation media0.005
Spares, insurance, misc.0.008
Total0.055

Range RM 0.048–0.058/kWh (≈ USD 0.011–0.014/kWh). Full-service O&M incl. overhauls: RM 0.065–0.085/kWh. Excludes pond O&M and upgrading.

Malaysian references

Thirty gensets, fourteen mills, since 2009

Shengdong biogas gensets already installed or in delivery in Malaysia: 16.4 MW across 30 units, 20 units running since 2009-2013 on POME biogas. Photos and site details from the manufacturer reference list.

BELL Eco Power Sdn Bhd biogas genset
BELL Eco Power Sdn Bhd500GF1-1RZ · 500 kW × 4 unit2009
Rompin Palm Oil Mill, Prosper Group biogas genset
Rompin Palm Oil Mill, Prosper Group500GF1-1RZ · 500 kW × 2 unit2009-2010
Kosfarm Palm Oil Mill, Prosper Group biogas genset
Kosfarm Palm Oil Mill, Prosper Group500GF1-1RZ · 500 kW × 1 unit2010
Wujud Palm Oil Mill, Prosper Group biogas genset
Wujud Palm Oil Mill, Prosper Group500GF1-1RZ · 500 kW × 1 unit2011
Prosper Palm Oil Mill, Prosper Group biogas genset
Prosper Palm Oil Mill, Prosper Group500GF1-1RZ · 500 kW × 2 unit2012
Cahaya Muda Palm Oil Mill biogas genset
Cahaya Muda Palm Oil Mill600GFZ1-RZ-ESM1 · 600 kW × 3 unit2011
Apas Balung Palm Oil Mill, Sawit biogas genset
Apas Balung Palm Oil Mill, Sawit500GF1-1RZ · 500 kW × 3 unit2011
KLK Group biogas genset
KLK Group600GFZ1-RZ-ESM1 · 600 kW × 4 unit2013
Tee Teh Palm Oil Mill biogas genset
Tee Teh Palm Oil Mill500GFZ1-RZ-ESM1 · 500 kW × 1 unitunder installation
Sapi Palm Oil Mill, Wilmar biogas genset
Sapi Palm Oil Mill, Wilmar500GFZ1-PwZ-ESM1 · 500 kW × 1 unitunder installation
Saremas 1 Palm Oil Mill, Wilmar biogas genset
Saremas 1 Palm Oil Mill, Wilmar500GFZ1-PwZ-ESM1 · 500 kW × 1 unitunder installation
Carotino Palm Oil Mill biogas genset
Carotino Palm Oil Mill600GFZ1-RZ-ESM1 · 600 kW × 2 unitunder installation
Biolermech Sdn Bhd, chicken farm biogas biogas genset
Biolermech Sdn Bhd, chicken farm biogas600GFZ1-RZ-ESM1 · 600 kW × 2 unitdelivered May
Asia Palm Oil Mill biogas genset
Asia Palm Oil Mill600GFZ1-RZ-ESM1 · 600 kW × 3 unitdelivered May

Genset brand: Shengdong. Reference list supplied by the manufacturer, September 2026. “Under installation” and “delivered May” are not yet commissioned.

Commercial models

Three ways to structure the project

Model 1

Equipment supply

Genset, gas train, panel and heat recovery. Civils and balance of plant by the client or their contractor.

Model 2

EPC turnkey

Single contract from pond cover to grid-tie, with local works under CIDB registration and DOSH-witnessed commissioning.

Model 3

BOO / shared savings

We fund and own the plant; the mill buys power or gas at a discount to its current cost.

Before we quote

Seven pieces of data we need

  • FFB throughput t/h and operating days
  • POME pond: stages, volume, HRT, covered or not
  • Measured biogas flow and composition
  • Electricity tariff or diesel consumption and price
  • Grid connection status and transformer capacity
  • Boiler fuel, steam demand and pressure
  • Load profile: base load, peaks, night shift

Send the data, get a capacity

We reply with a gas balance, a unit size and an indicative budget within three working days.