Model 1
Equipment supply
Genset, gas train, panel and heat recovery. Civils and balance of plant by the client or their contractor.
Biogas to power
A POME biogas plant is a chain, not a machine. Gas quality at the engine inlet decides whether you get 8,000 hours or 4,000 hours between overhauls.
Process chain
Selection
At 60% CH₄ and 38–40% electrical efficiency, one cubic metre of biogas carries about 2.2 kWh of electricity.
| Electrical output | Gas at 60% CH₄ | Gas at 55% CH₄ | Recoverable heat |
|---|---|---|---|
| 300 kW | 132 – 140 Nm³/h | 144 – 153 Nm³/h | 330 – 390 kW |
| 500 kW | 220 – 234 Nm³/h | 240 – 255 Nm³/h | 550 – 650 kW |
| 600 kW | 265 – 280 Nm³/h | 289 – 306 Nm³/h | 660 – 780 kW |
| 800 kW | 353 – 373 Nm³/h | 385 – 407 Nm³/h | 880 – 1,040 kW |
| 1,000 kW | 441 – 466 Nm³/h | 481 – 509 Nm³/h | 1,100 – 1,300 kW |
| 1,500 kW | 662 – 699 Nm³/h | 722 – 763 Nm³/h | 1,650 – 1,950 kW |
| 2,000 kW | 883 – 932 Nm³/h | 963 – 1,017 Nm³/h | 2,200 – 2,600 kW |
Full-load figures. Running below 70% load for long periods causes carbon build-up and shortens the overhaul interval — size down or split into two units.
Gas specification
These limits are the basis of our warranty discussion with the engine supplier. If your gas cannot meet them, the treatment scope changes — we would rather say so before the order.
| Methane content | ≥ 50% (design 55–65%) |
| H₂S at engine inlet | ≤ 200 ppm, target ≤ 100 |
| Water dew point | ≤ 10 °C above ambient |
| Gas temperature | ≤ 40 °C |
| Inlet pressure | 5–15 kPa, ±1 kPa |
| Pressure fluctuation | ≤ 10% per minute |
The most common mistake: accepting raw POME gas at 2,000–4,000 ppm H₂S. It halves lube-oil life and doubles maintenance cost, invisibly, until the first overhaul.
Economics
600 kW at 8,000 h/year, gas at 60% CH₄ after scrubbing:
| Item | RM/kWh |
|---|---|
| Oil, filters, spark plugs | 0.014 |
| Routine service labour | 0.012 |
| Overhaul reserve | 0.016 |
| Desulfurisation media | 0.005 |
| Spares, insurance, misc. | 0.008 |
| Total | 0.055 |
Range RM 0.048–0.058/kWh (≈ USD 0.011–0.014/kWh). Full-service O&M incl. overhauls: RM 0.065–0.085/kWh. Excludes pond O&M and upgrading.
Malaysian references
Shengdong biogas gensets already installed or in delivery in Malaysia: 16.4 MW across 30 units, 20 units running since 2009-2013 on POME biogas. Photos and site details from the manufacturer reference list.














Genset brand: Shengdong. Reference list supplied by the manufacturer, September 2026. “Under installation” and “delivered May” are not yet commissioned.
Commercial models
Model 1
Genset, gas train, panel and heat recovery. Civils and balance of plant by the client or their contractor.
Model 2
Single contract from pond cover to grid-tie, with local works under CIDB registration and DOSH-witnessed commissioning.
Model 3
We fund and own the plant; the mill buys power or gas at a discount to its current cost.
Before we quote
We reply with a gas balance, a unit size and an indicative budget within three working days.